Project Overview
Project: Modular Carbon Capture Plant
Fabrication: Grimsby, United Kingdom
Installation: Hannover, Germany
Scope: Full Mechanical, Electrical & Insulation, Fabrication & Installation
Project Value: £1.5M to £2M
Site Labour: Over 6,500 safe working hours
Safety Performance: Zero Accidents | Zero Incident
Project Summary
We successfully delivered the complete mechanical, electrical and insulation installation of a modular carbon capture plant fabricated in the UK at Blackrows workshop and transported to Hannover, Germany for final assembly and commissioning.
Working as the principal MEI installation contractor, our multidisciplinary team managed the fabrication, installation, integration and commissioning support of the complete process plant, ensuring seamless coordination between mechanical and electrical systems within a compressed construction programme.
The installation included:
- Seven modular process skids
- One adiabatic cooler
- One process scrubber
- Complete interconnecting process pipework
- Mechanical installation and alignment of all equipment
- Electrical installation, including cable containment, power distribution, lighting, instrumentation and control systems
- Thermal insulation to chilled water pipework, process drains and flue gas systems, providing frost protection, heat conservation and personnel protection across the e facility.
The modular construction approach significantly reduced on-site construction time while improving quality control, minimising site disruption and accelerating the overall delivery programme.
Project Summary
Blackrow Group delivered the complete workshop fabrication of seven modular process skids. Building in a controlled environment optimised material control, eliminated weather delays and allowed our multidisciplinary teams to seamlessly integrate structural, mechanical, piping and electrical systems prior to international transit.
Scope of Works
Structural: Fabricating heavy structural steelwork skid frameworks.
Mechanical: Positioning assets using 10t & 20t overhead cranes and precision equipment alignment.
Piping: Workshop fabrication and support installation of process pipework runs.
Electrical: Assembling cable containment, instrumentation and modular pre-wiring.
Project Challenges & Solutions
Trade Sequencing: Managed multiple disciplines inside a fixed footprint through strict scheduling.
Tight Tolerances: Maintained strict dimensional control across seven independent skids.
Interface Risks: Pre-planned layouts to eliminate clashes between piping and electrical lines.
Compressed Timeline: Shared workshop data across teams to expedite fabrication safely.
Key Results
Factory Quality: High-quality workmanship achieved via indoor, factory-controlled conditions.
Site Ready: Delivered seven fully integrated skids, significantly reducing on-site construction risks.
On Time: Completed all fabrication works in line with the master assembly programme.
Flawless Safety: 6,237 safe man-hours with 100% health and safety compliance
Project Scope
Our multidisciplinary team delivered a full turnkey Mechanical & Electrical installation package, including:
Our mechanical team delivered the complete installation and integration of the process plant, including:
- Positioning and installation of seven modular process skids
- Installation of the adiabatic cooler
- Installation of the process scrubber vessel
- Assembly and installation of all interconnecting process pipework
- Mechanical alignment and connection of all process equipment
- Installation of support steelwork
- Mechanical completion and punch-list activities
- Pressure testing and final mechanical verification
Our electrical team provided a complete installation package comprising:
- Installation of cable containment systems
- Low-voltage power distribution and cabling
- Lighting installation
- Instrumentation installation and termination
- Control cabling between modular process units
- Electrical testing and inspection
- Commissioning and start-up support
Our specialist insulation team delivered a comprehensive insulation package across the
process plant, including:
- Insulation of chilled water pipework for frost protection and system efficiency
- Insulation of process drain pipework to protect against freezing during winter operation
- Insulation of flue gas ductwork and associated equipment for heat conservation and personnel protection
- Installation of weatherproof cladding and finishes suitable for external service conditions
- Installation in accordance with project specifications and quality standards
- Final inspection and quality assurance prior to commissioning
The insulation scope was designed to improve operational efficiency, minimise heat loss, protect critical process systems from low ambient temperatures and ensure safe operating surface temperatures for personnel
Project Challenges
Delivering a modular process plant across international borders required detailed planning, technical expertise and close coordination between multiple project stakeholders.
Key challenges included:
- Managing international logistics from the United Kingdom to Germany
- Completing installation during severe winter conditions with heavy snowfall
- Achieving precise alignment of seven independently manufactured process modules
- Installing and integrating complex interconnecting pipework
- Coordinating simultaneous mechanical and electrical installation activities within a
compressed programme - Supporting multiple contractors and the client team throughout commissioning and plant start-up
Through detailed planning, effective project management and close collaboration, the project was completed safely, efficiently and to the client’s programme
Health, Safety & Quality
Health and safety remained our highest priority throughout every phase of the project.
Our proactive safety culture, comprehensive risk assessments, detailed method statements and strong site supervision ensured all works were completed without incident while maintaining the highest standards of quality and compliance.
Safety Performance
- Fabrication & Installation 12,769 Safe Man Hours
- Zero Lost Time Injuries (LTI)
- Zero Accidents
- Zero Incidents
- 100% Safety Complianc
Project Results
The successful delivery of the project provided the client with:
- Safe installation of a modular carbon capture facility
- Efficient integration of mechanical and electrical systems
- Reduced installation duration through modular construction
- Completion within the agreed programme
- High-quality workmanship throughout
- Successful commissioning and plant start-up support
- Outstanding health and safety performance
Project at a Glance
Our multidisciplinary team delivered a full Mechanical & Electrical installation package, including:
| Detail | Value |
| Project | Modular Carbon Capture Plant |
| Fabrication | United Kingdom |
| Installation Location | Hannover, Germany |
| Project Value | £1.7 Million |
| Scope | Full Mechanical, Electrical & Insulation |
| Modular Process Skids | 7 |
| Adiabatic Cooler | 1 |
| Process Scrubber | 1 |
| Welds Completed | 2,013 |
| Pressure Tests Completed | 102 |
| Fabrication Labour | 6,237 Safe Man Hours |
| Site Labour | 6,532 Safe Man Hours |
| Safety Performance | Zero Accidents • Zero Incidents |
Delivering Complex Modular Projects Across Europe
This project demonstrates our capability to deliver complex modular process fabrication & installations across international locations, combining expert mechanical, electrical and insulation services with robust project management and an uncompromising commitment to safety.
By successfully installing and integrating this high-value carbon capture facility, we helped our client accelerate delivery of critical lowcarbon infrastructure while achieving exceptional standards of quality, programme performance and safety.
From fabrication support through to installation, commissioning and project completion, our team continues to deliver engineering solutions that support the transition to a more sustainable industrial future.